KV-5 (Object 225) - A cancelled project for a super-heavy tank. Armament was to be a 107 mm ZiS-6 gun in a large turret and machine-gun in a small secondary turret. Weight was projected as about 100 tons, and the tank was to have 150-180mm of armor. Project development began in June 1941, however was cancelled due to the Siege of Leningrad, in which all developmental operations at the Kirov Plant were halted. The project fell out of favour from the more advanced heavy tank designs, and no prototype was built.
Verantwortlichkeitsangaben sind nicht verfügbar.
KV-5 (Object 225) - A cancelled project for a super-heavy tank. Armament was to be a 107 mm ZiS-6 gun in a large turret and machine-gun in a small secondary turret. Weight was projected as about 100 tons, and the tank was to have 150-180mm of armor. Project development began in June 1941, however was cancelled due to the Siege of Leningrad, in which all developmental operations at the Kirov Plant were halted. The project fell out of favour from the more advanced heavy tank designs, and no prototype was built.
Unsere Berater und Sortimentskenntnisse sind bereit, Ihre Fragen zu beantworten (Mo–Fr, 8–18 Uhr).
Fragen Sie, was Sie brauchen, wir antworten so schnell wie möglich.
Texte von Kunden im Ratgeber spiegeln ausschließlich die Meinungen und Standpunkte der Kunden wider. Das Unternehmen MNF trade s.r.o. genehmigt oder überprüft Kundentexte nicht im Voraus.
Es gibt noch keine Fragen hier. Seien Sie der Erste, der fragt!